Elektroprivreda BiH

From the legal - organizational standpoint beginning of Elektroprivreda BiH is bound to the Regulation on the Establishment of Electric Utility Company…

TPP Kakanj

The construction of thermal power plant was carried out in stages, in the period between 1947 and 1988. Generation of electricity began in 1956 with the…

TPP Tuzla

Construction of the complex of this thermal power plant was realized in several stages in the period between 1959 and 1978. Generation of electricity…

Hydro Power Plant “Grabovica”

Location of facility - the river Neretva, Herzegovina - Neretva Canton

Hydro Power Plant “Jablanica”

Hydro Power Plant “Jablanica” is the first and largest power plants on the river Neretva. It was built in two phases from 1947 to 1955 and from 1955…

Hydro Power Plant “Salakovac”

Construction of the Hydro Power Plant lasted from 1977 to December 1981. HPP “Salakovac” is connected to the power system with 220 kV transmission…

Small Hydro Power Plants

JP Elektroprivreda BiH own eight distribution hydro power plants with total installed capacity of 13 MW. Small hydro power plants are managed ny distribution…

Coal Mine “Gračanica”

Coal exploitation in mine “Gračanica” dates from 1938. The most intensive development of the mine was in the period between 1981 and 1991. Average…

Brown coal mine “Kakanj”

Mine has officially existed since 1902. Production facilities of the mine are: facility “Haljinići” - underground mining and facility “Vrtlište”…

Brown coal mine “Zenica”

Facilities within the RMU Zenica are: “Stara jama”, “Raspotočje”, “Stranjani” and Separacija – facility for coal processing. Mine “Zenica”…

Mines “Kreka” in Tuzla

First ton of coal was excavated on September 22nd 1884 for the purposes of salt factory in Simin Han. The subsidiary company - mines “Kreka” in Tuzla…

Brown coal mine “Breza”

Coal mine “Breza” was founded in 1907. Coal mining in the mine is done in pits in facilities: pit “Sretno” and pit “Kamenice”

Brown coal mine “Đurđevik”

RMU “Đurđevik” began with operation in 1936 when the first pit “Suhodanj” was opened. Organizational parts of RMU “Đurđevik” are: open…