Hydro Power Plant “Kruševo”

Location of facility: the river Bioštica, the area of municipality Olovo

Investment

Investment: -
Financing: -

Project status

Completed activities:

  • The Technical Report of hydropower usage of the river Bioštica
  • The Economic and Financial Analysis for HPP Kruševo with HPP Zeleni Vir
  • The Study of hydropower usage of the river Bioštica in the municipality of Olovo with The Conceptual design of hydropower plants
  • Performed technical survey and demining the area that is planned for the construction of HPP Kruševo with Zeleni Vir

Activities in progress:

  • Drafting Prefeasibility study HPP Kruševo including Economical and Financial assessment